Description
Because of the recent heavy rain and continuous heavy traffic along the eastern end of Armory St., a fairly deep pothole has opened up and needs to be repaired along the edge of the temporary patch over the RWA repair site of the major water main break last month.
8 Comments
Director, Public Works (Registered User)
Staff Engineer (Verified Official)
Staff Engineer (Verified Official)
Acknowledged Staff Engineer (Verified Official)
Staff Engineer (Verified Official)
"Talked to our facilities department they are going out there this afternoon"
Closed Engineering Inspector (Registered User)
dan (Registered User)
dan (Registered User)