Two incomplete sidewalk repairs (asphalt) on concrete sidewalk 已确认

3819 S Street Northwest Washington, District of Columbia 在地图上显示 隐藏地图
Move the marker to represent your issue's location. The address will not change.

报告人

问题 ID:

787675

Submitted To:

DC 311

类别:

Roadway Repair

已查看:

1677 次数

社区:

Georgetown

已报告:

服务请求 ID:

13-00249905

说明

Please inspect north side of S St NW (entire block) between 38 NW and 38 NW. There are two instances of temporary, asphalt utility repairs. Per DDOT, utilities must restore sidewalk to original condition (concrete). Thank you.


发表新评论

1 评论

  • 已确认 DC 311 (注册用户)

新评论

无法将此问题更改为公开状态.