الوصف
SEPTA's Market Street El reconstruction in West Philly has been completed for nearly 2 years now and Market Street under the El is still torn up as a result of the El construction, loaded with bumps, dips, potholes and "temporary" patches. It is in serious need of a repaving and I want to know if or when it is going to get done.
6 تعليقs
تم إقراره Philly311 (مستخدم مسجل)
Rob Slater (مستخدم مسجل)
Baba Bob Shipman (مستخدم مسجل)
Anonymous (ضيف)
JR (ضيف)
Jeanette MacNeille (ضيف)